Gray contour lines on a black background forming a topographic map or abstract design.
Text that reads 'Scenario Sprint' on a black background.

From many possible futures to one you can defend.

A data-driven process of about eight weeks. We generate optimized futures for the site, inspect each one in depth and side by side, and resolve the decision by stress-testing every path against conditions no one controls, until one earns the recommendation.

Before the site is committed

The Sprint is built for the moment before a site's future is fixed: when the change is large enough that its effects need forecasting, the options can't yet be compared, and the trade-offs are still hidden.

Scenarios as instruments

Plans are usually treated as end products: one image of the future, fixed early and defended afterwards. The Sprint treats scenarios as working instruments. Each is a temporary version of the future, built from a different position, so that comparing and testing them reveals the structure of the decision: what every future shares, and the few choices that truly divide them.

That structure is the real product. It stays useful as conditions change, which a single image of the future cannot.

A woman standing in a natural outdoor setting with green foliage in the background.
A woman standing in a natural outdoor setting with green foliage in the background.

How it Works

A black slip-on shoe viewed from the side.
A black stethoscope on a black background.
Silhouette of a stylized black bird with a curved beak against a black background.
A black and white illustration of a modern, sleek racing car viewed from the side.
Close-up of the word 'Generate' written in large, black font.
Text overlay stating 'Frame' and 'Define the objectives' on a black background.

We establish what must be decided, what is fixed, and chart the tensions that make the choice hard. We agree on how every future will be measured. You receive the Frame report delivered before anything else. You approve it before scenarios are built.

Silhouette of a bird's head in profile, facing left.
The image shows the phrase 'Build Generate Scenarios' in large, black words on a black background.

Three scenarios, each from a different end of the site's tensions, generated from data and optimized within their own logic. You receive each scenario's design variants, the trade-offs between them, and a 3D model of the selected version.

Close-up of a white snow-capped mountain against a blue sky with some clouds.
A black background with the word 'Inspect' written in large, bold, black letters.
Black and white word cloud with words 'Compare' and 'Weigh the futures on equal terms'.

Each scenario is analyzed in depth: its form, how it works as a place, and whether it can be delivered. You receive a profile of each, with every figure sourced.

Close-up of a screen displaying the words 'Evaluate' and 'Analyze each future in depth' in large, gray text.

The three scenarios on equal terms, in the same measures, at the same visual quality. You receive a side-by-side view of what each gains and gives up.

Abstract black background with subtle gradients and curved lines.
Black silhouette of a human head with a speech bubble near the mouth.
A plaque with engraved words that are difficult to read, but appears to be on a metal or stone surface.
A black and white graphic with the words 'Stress-test: Expose where each path breaks' in large text.

What every scenario shares, the few choices that divide them, and where each path breaks under conditions you don't control. You receive the branching diagram: what to commit now, what to hold open, and for how long.

The image contains a large black text overlay on a transparent background with the words 'Recommend' and 'Recommend a strategy and its conditions' in a stylish font.

A recommended strategy, with the conditions it depends on and the signal that would change it. You receive the recommendation, illustrated with a regulating plan and renders of the recommended future.

A glimpse into a sprint

A fictional site, followed through all six steps.

Step 5 is live: change a condition and watch the recommendation respond.

An illustrative example of the Stress-test step. A fictional waterfront site with arbitrary figures.

Stress-test Example

Most of what this site needs is shared by every scenario. Only one choice diverges.
Move the housing sale price and see which path holds, and when the answer changes.

The horizontal axis is cumulative commitment, not calendar time. Branch width shows the share of the program travelling each path. The shaded field is the deferral window: every path stays reachable until the choice closes.

€5,400/m²
A's critical range
€3,800€6,200

Commit now

  • Street grid and utilities;
  • Waterfront promenade;
  • School plot reservation;
  • Metro stop.

The fork

Phase 2 blocks: housing-led, employment-led or green-first?

Holds while
Signal to watch
Decide by
Phase 2 land allocation, estimated Q3 2028

Before we start

Black background with gray concentric, irregular, wave-like lines forming a 3D abstract pattern.

Facing an urban change?